Gate Check: Concept → Systems Design
Date: 2026-08-25 Checked by: gate-check skill (review mode: full)
Required Artifacts: 4/4 present
- [x]
design/gdd/game-concept.md— 411 lines, document-review validated (READY, 4 fixes applied) - [x] Game pillars — 5 pillars with design tests + 4 anti-pillars (CD-PILLARS sharpening edits applied)
- [x] Visual Identity Anchor — "Tideline": one-line rule + 3 principles with design tests
- [x] (Recommended) Concept prototype —
prototypes/combat-netcode-feel-concept/REPORT.md, PROCEED (CD-modified)
Quality Checks: 4/4 passing
- [x] Design review verdict READY (not MAJOR REVISION)
- [x] Core loop described at all four time scales
- [x] Target audience identified (private friend group, player-type analysis done)
- [x] VIA exceeds minimum (1 rule + 3 principles + color philosophy)
Director Panel Assessment
| Director | Verdict | Core message |
|---|---|---|
| Creative Director (Opus) | CONCERNS | 3 scope-to-pillar gaps → carried as binding GDD line items in design/gdd/systems-design-brief.md |
| Technical Director (Opus) | CONCERNS | Constraints not in enforcing docs; scheduler unvalidated; stale engine pointer → ALL RESOLVED same-day (see below) |
| Producer (Opus) | CONCERNS | GDD scope explosion risk → 5-GDD discipline adopted in phase brief |
| Art Director (Sonnet) | READY | Tideline anchor sufficient to seed GDDs and art bible |
Concern Resolution (same-day)
- ✅
docs/CLAUDE.mdengine pointer fixed (godot → unity) - ✅ Forbidden Patterns + Allowed Libraries populated in
.claude/docs/technical-preferences.mdfrom the confirmed netcode model - ✅ Tide scheduler determinism + harvest-diff dock/undock round-trip validated — 9/9 contract tests pass (
prototypes/tide-scheduler-spike-2026-08-25/SPIKE-NOTE.md) - ✅ CD + PR guidance recorded as binding phase brief (
design/gdd/systems-design-brief.md) - ⏳ Friend-group playtest — external task, tracked in phase brief and concept doc Next Steps; gates the netcode ADR, not this phase
Verdict: CONCERNS → advanced with concerns resolved
Chain-of-Verification: 5 questions checked (2 tool-verified: stale pointer and empty Forbidden Patterns both confirmed real before fixing) — verdict unchanged.
User decision: fix concerns, then advance. Stage updated to Systems Design.